ИСТИНА |
Войти в систему Регистрация |
|
ФНКЦ РР |
||
The current status of the equipment development for the new wide-angle gamma-ray imaging air Cherenkov telescope for TAIGA hybrid installation [1] is presented. A front-end electronic and data acquisition system board based on the Zynq family Xilinx FPGA chips specially designed for this project have been produced and are being tested. A detailed description of the internal structure of the four main subsystems of the board: four 8-channel 100 MHz ADCs, boards control system, internal clock and synchronization system and the power supply. Additionally, the current status of a small scale prototype telescope SIT consisting of 49 SiPM is presented. The telescope includes a digital camera for observing the stars and weather condition. The SIT-HiSCORE synchronization systems and the telemetry information collection had been tested.
№ | Имя | Описание | Имя файла | Размер | Добавлен |
---|---|---|---|---|---|
1. | Полный текст | Постерный доклад | Tunka_SiPM_TIPP2021_final.pdf | 1,6 МБ | 1 июня 2021 [ptrwww] |